2nd Light Forums |
Topic Title: Construction on Pineda beachside Topic Summary: Created On: 08/06/2019 10:21 AM |
Linear : Threading : Single : Branch |
- sw | - 08/06/2019 10:21 AM |
- The Political Thinker | - 08/06/2019 10:25 AM |
- Central Floridave | - 08/06/2019 01:18 PM |
- Cole | - 08/06/2019 08:52 PM |
- dab | - 08/07/2019 09:54 AM |
- sw | - 08/07/2019 06:00 PM |
- Central Floridave | - 08/09/2019 10:37 AM |
- tom | - 08/09/2019 11:09 AM |
- Cole | - 08/09/2019 09:56 PM |
- sw | - 08/10/2019 05:33 AM |
- Cole | - 08/10/2019 11:16 AM |
- scombrid | - 08/14/2019 07:09 AM |
- tom | - 08/14/2019 07:26 AM |
- The Political Thinker | - 08/14/2019 09:08 PM |
- Central Floridave | - 08/11/2019 08:57 AM |
- The Political Thinker | - 08/11/2019 07:09 PM |
- tom | - 08/13/2019 06:11 AM |
Topic Tools
|
08/10/2019 11:16 AM
|
|
After most of the water flows out of the muck, trucks will haul it to Platt Ranch, at the south side of U.S. 192, west of Interstate 95, where the muck will be tilled into the ground to fertilize pastures.
Isn't that the edge of the St Johns watershed? ------------------------- I was right. |
|
|
|
FORUMS
:
NPNR
:
Construction on Pineda beachside
|
Topic Tools
|
FuseTalk Basic Edition - © 1999-2024 FuseTalk Inc. All rights reserved.
First there was Air Jordan .